Wings formwork travellers for Mersey Gateway Bridge

 



Wings formwork travellers for Mersey Gateway Bridge

Customer: Merseylink
Country: UK
Location: Widnes, (Liverpool)
Year: 2015 to 2017

Description:

Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.

What was the challenge?:
Avoid the use of scaffold and the lowering of FT on each movement and internal form adaptability to the different cross sections.

Wings formwork travellers for Mersey Gateway Bridge

Customer: Merseylink
Country: UK
Location: Widnes, (Liverpool)
Year: 2015 to 2017

Description:

Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.

What was the challenge?:
Avoid the use of scaffold and the lowering of FT on each movement and internal form adaptability to the different cross sections.

SEE WHAT ELSE WE’VE BEEN DOING


Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.